Offshore oil gas jackup drill rig-Trident VIII

Modec 300-C35 IC Jackup Rig Info/Jobs.


For Shelf Drilling, the Nigerian offshore market remains an exciting investment destination. Among the rigs currently committed to offshore Nigeria oil and gas exploration companies is Modec 300-C35 Trident VIII that has been contracted to AMNI International Petroleum Development Company Limited, a Nigerian independent oil and gas exploration and production firm that is also engaged in subsea flow line transportation and pipeline systems. The rig’s contract runs for a year up to June 2020 with the oil explorer having an option of two more wells.


Rig Name:       Trident VIII

Owner:            Trident VIII Ltd.


Manager:         Shelf Drilling, Ltd.

Rig Type:         Jackup

Sub Type:        Independent Leg Cantilever

Jackup Type:  Standard

Max Water Depth (ft): 300

Max Drill Depth (ft):    21,000

Dimensions (ft):          229 x 210 x 24

Leg Length (ft):           408

Competitive:                Yes

 


Current Location:

Country:          Nigeria

Region:            West Africa

 

Rig Construction Details:

Rig Design:     Mitsui Modec


Rig Model:       300-C-35

Year Built:       1981

Country of Build:         Japan

Yard Name:                Tamano Shipyard

Group Yard Name:     Mitsui Engineering & Shipbuilding Co., Ltd.

 

Rig Contract Details:

Operating Status: Operational

Operator:           Amni Petroleum


 

The Trident VIII is a Jackup type of rig and is designed as a Mitsui Modec 300 C-35 and built by Mitsui at the Japan shipyard. The rig was built in 1981 and last upgraded in 2018. The rig can be operated in water depths of 300 ft and drill down to about 21,000 ft.

On March 02, 2020, jackup rig has received extension of previous contract for option of two more wells from Nigerian oil and gas operator AMNI in offshore Nigeria. The extension of the contract is expected to start from June 13, 2020 and run until Oct 13, 2020 for duration of 122 days. The estimated dayrate for the contract is US $ 65 000.



Even as Shelf Drilling samples the inherent opportunities in Nigeria’s offshore space, and indeed West Africa, the company looks forward to using the current global rig market trend towards recovery to modify its contract pricing method, which it currently bases on dayrates, now at the lowest levels in years.

Shelf Drilling admits there is intense price competition among the international rig market players and it is proposing to shift its charges from dayrates to footage basis.

“While we plan to continue to perform services on a dayrate basis, market conditions may dictate that we

enter into contracts that provide for payment based on a footage basis, where we are paid a fixed amount for each foot drilled regardless of the time required or the problems encountered in drilling the well, or enter into turnkey contracts whereby we agree to drill a well to a specific depth for a fixed price and bear some of the well equipment costs,” said Shelf Drilling.



The improvement of the uptake of Shelf Drilling’s jack-up rigs in Nigeria, resonates with the current global trend of a recovering offshore rigs market with projections of a steady growth in coming days on the back of surge in oil demand, positive performance of economies in regions such as West Africa and growing appetite for unexplored offshore oil and gas assets.

On August 15, 2018, Shelf Drilling said the rig had

been awarded a contract for 245 days firm term in Nigeria by Amni. The contract for the 1981-built rig is expected to start in Q1 2019. Amni will have an option to extend for another 110 days. The Trident VIII rig, which has been idle following the completion of a contract with Chevron Nigeria in December 2017, is currently undergoing upgrade and contract preparation in Bahrain.





Trident VIII:300 Foot Jack-up Drilling Unit

 General Description:

 Design: Modec 300 C-35

Year Built / Last Upgrade: 1981 / 2018

Hull Dimensions: 230 ft. by 210 ft. by 24 ft.

Legs (3): 408 ft. long Triangular

Quarters Capacity: 116 persons

Maximum Water Depth: 300 ft.

Cantilever Envelope: 45 ft. by 24 ft., (or 55 ft by 24 ft. with extension)

Maximum Variable Load (drilling): Approx. 6,900 kips*,

*depending on water depth and geographical location

 


Drilling Equipment:

Derrick: Branham 160 ft. x 30 ft. x 30 ft., static hook load

of 1,044 kips with twelve (12) lines

Drawworks: Gardner Denver 1500 RE 2,000 HP driven by

two GE 752 DC motors, 1-1/2 in. drilling line,

with Elmagco 7838 auxiliary brake

 


Rotary Table: National C-375 650 short tons, driven by GE

752R 800 HP motor

Top Drive: Varco TDS-4S, 650 st with 1,100 HP motor,

45,500 ft.lbs. continuous torque @ 130 rpm

Varco PH85 pipe-handler system

Tubular Handling: NOV ST-80 for tubular OD size 4.1/4" to 8.1/2";


Mud Pumps: Three (3) Gardner Denver PZ11, 5,000 psi

triplex pumps, each driven by two GE 752 800

HP DC motors

Solids Control: Four (4) Brandt VSM 300 dual deck shakers

1,050 GPM; one (1) Brandt VSM 300

desander with 3 x 12" cones 1,000 GPM; one

(1) Brandt VSM 300 mud cleaner with 20 x 4"

Cones

 


Storage Capacities:

Liquid Mud: 2,338 bbls (including Slug Pit)

Base Oil: 609 bbls

Drill Water: 14,825 bbls

Fuel: 3,473 bbls

Bulk Mud: 4,500 cu. ft.

Bulk Cement: 4,500 cu. ft.

 


Power Equipment:

Main Power: Four (4) Cat D399 1,215 HP each + one (1)

Cat D3512 1,284 HP engines, driving five

(5) GE ATI 1,200 kW 600V AC generators;

Power Dist.: Seven (7) Hill Graham / Alstom SCR with

750 volts 1,200 kW

 

Well Control Equipment:

Diverter: Regan KFDJ diverter, 500 psi, 27-1/2 in.

maximum bore

13-5/8 in. BOP: One (1) Hydril GK 5K annular preventer;

two (2) Cameron Type U 10K double ram

preventers

 


Cranes:

Three (3) Marathon LeTourneau PCM-120 pedestal cranes: one (1)

crane with 100 ft. boom rated for 50 short tons at 24 ft. radius; two

(2) cranes with 120 ft. booms, rated for 42.5 short tons at 28 ft.

radius.

 


Special Features:

Shallow Draft: The rig is designed to transit in water depths as

shallow as 11 ft (LAT).

Ten (10) ft. pin on extensions are available to increase the cantilever

maximum skid out distance to 55 ft. aft of the stern



Shelf Drilling FSR 2 March 2020

 

Rig Status Updated: Shelf Drilling FSR 2 March 2020/13 May 2020

 

West Africa;                                       

Rig Name:                               Trident VIII     

Rig Design:                             Modec 300-C35         

Max Water Depth (Feet):        300     

Customer:                               Amni   

Location:                                 Nigeria            

Contract Start Date:                Feb 2019        

Contract End Date:                 Oct 2020        

Comments:                             ----



Fixture date:               02.03.2020     

Name:                         Trident VIII     

Type:                           Jackup           

Rig manager:              Shelf Drilling   

Operator:                     AMNI  

Country:                      Nigeria            

Day rate:                      65 000            

Duration (days):          122     

Start date:                   13.06.2020     

End date:                     13.10.2020     

Comment:                   Estimated dayrate. Extension of previous contract...



Vessel Name:              Trident VIII

Owner:                        Shelf Drilling

Rig manager:              Shelf Drilling

Type:                            Jackup Rig

Design category:         Jackup 300-349ft IC

Full design name:        Modec 300-C35

 


IMO:                            8756409

Class:                          ABS

Constructed at:           Mitsui Engineering & Shipbuilding

Year in SVC:               1981

Latest upgrade:           ----

Competitive:                Yes

SPS due date:             30.09.2021



Vessel Name: TRIDENT VIII
IMO: 8756409
Vessel Type - Jackup Platform
MMSI: 636009825
Call Sign: ELPP2
Flag: Liberia [LR]
Gross Tonnage: 7292 t
Summer DWT: -
Length Overall x Breadth Extreme: 70 x 64 m
Year Built: 1981
Home Port: MONROVIA
Status: Active

Voyage Information:

GQ LUB(LUBA): ATD: 2020-09-08 17:11 LT (UTC +1)---------->---------->---------->L

Reported ETA: 2021-04-07 06:00 LT

Reported Destination: L

Draught (Reported/Max): 3.5 m/----

Speed recorded (Max / Average): 13.7 knots/13.7 knots

Reported Destination and ETA Received 2021-01-15 01:41 UTC


Position:
Position Received: 2021-01-15 08:05 UTC 5 hours, 46 minutes ago
Vessel's Local Time: 2021-01-15 09:05 LT (UTC +1)
Area: WAFR - Gulf of Guinea
Current Port: -----
Latitude / Longitude: 4.576674° / 8.421848°
Status: Restricted Manoeuvrability
Speed/Course: 0 kn / 262 °
AIS Source: Terrestrial AIS

Weather:
Wind: 10 knots
Wind direction: SW (214°)
Air Temperature: 28°C



Jack-up rig TRIDENT VIII is currently located at WAFR - Gulf of Guinea at position 4° 24' 33.264" N, 7° 49' 30.133" E as reported by MarineTraffic Terrestrial Automatic Identification System on 2020-03-19 19:22 UTC (8 minutes ago)
The wind in this area at that time blows from North direction at force 0 Beaufort.



Ex Names History:
Flag:    Vessel Name:    Last Reported:
----     SANTA FE RIG 141     2002-11-01 UTC